Zebra Stripe Technical Information Page 67

  • Download
  • Add to my manuals
  • Print
  • Page
    / 119
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 66
This procedure starts on the previous page. The sequence below is to be
followed only if the power leads at the Ribbon Take-Up Motor are connected by
removable spade lug connectors.
11. Disconnect the RED power lead from the spade lug connector at the rear of
the Motor. Be very careful when sliding the spade clip connector off of
the spade lug so the capacitor leads are not broken.
12. Attach the Negative (Black) lead of an Ammeter to the uncovered spade lug
on the motor and the Positive (Red) lead of the Ammeter to the spade clip
removed in the previous step.
13. Set the Ammeter current range to read at least 2 Amps.
14. Press the PAUSE Key while turning the power ON. After the Power ON
Self Test is completed, Self Test labels will feed out at a rate of 2 inches per
second. This is the printing speed required for the following steps.
15. While viewing the display on the Ammeter, adjust potentiometer RV3
clockwise or counterclockwise to obtain a current level of 1.15 Amps while
printing labels.
16. When the correct current level is obtained, press the PAUSE Key to stop the
label printing process.
17. Turn the printer power OFF, reconnect the RED power lead to the motor and
remount the Rear Cover.
18. Reload the media and ribbon and the printer is ready to operate.
Page 5-28 44868L
Page view 66
1 2 ... 62 63 64 65 66 67 68 69 70 71 72 ... 118 119

Comments to this Manuals

No comments