Zebra 105SL Specifications Page 101

  • Download
  • Add to my manuals
  • Print
  • Page
    / 246
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 100
32056L Rev. 2 12/4/01 105SL Maintenance Manual Page 4-15
PREVENTIVE AND CORRECTIVE MAINTENANCE SECTION 4
NOTE: Retain all attaching hardware to use during reassembly.
3. Refer to Figure 4-10. Remove the nut holding the ground lead from the power entry
module to the printer chassis.
4. Remove the connector from the AC power supply at J1.
5. Remove the three screws holding the back panel to the printer.
6. Remove the two screws holding the logic board and aluminum plate to the printer.
NOTE: It is possible to remove the main logic board with all the connectors still
attached. If you prefer to remove all cables and wires, refer to Figure 4-4.
7. Slide the main logic board and rear panel assembly out and away from the printer.
8. Remove the connector from the AC power supply at J2.
9. Remove the five nuts and two spacers that hold the assembly against the threaded
mounting posts and remove the AC power supply.
NOTE: The black heat conduction pad MUST NOT be discarded. You might have
to remove a hex head fastener in front of the board on the bottom.
To install the AC Power Supply Assembly:
1. Ensure the heat conduction pad is in position. Position the cables out of the way while
placing the new AC power supply assembly onto the five threaded mounting posts.
Figure 4-10. AC Power Supply and Main Logic Board Removal/Installation
Main Logic Board
and Rear Panel
Shield
AC
Power Supply
Assembly
Heat
Conduction
Pad
Power Entry
Module
POWER
TAKE LABEL
ERROR
CHECK RIBBON
CANCEL
FEED
PAPE R OUT
PAUSE
DATA
P
R
E
V
I
O
U
S
PREVIOUS
N
E
X
T
/S
A
V
E
NEXT/SAVE
SETUP/EX
IT
SETUP/EXIT
Page view 100
1 2 ... 96 97 98 99 100 101 102 103 104 105 106 ... 245 246

Comments to this Manuals

No comments